
In that time, GDP growth has averaged less than 2%, far below the level required to meet an expanding list of needs. In 2024, the economy grew by only 0.6%. Over the medium term, GDP growth is projected to average 1.8%.
Eskom is now in a much better financial position than in 2023 when the debt relief was originally announced. As a result of these improvements, the government has decided to simplify the final phase of the debt relief package. The last R70 billion debt takeover will now be replaced with R40 billion in 2025/26, and R10 billion in 2028/29. This will result in a saving for the government of about R20 billion.
The energy reforms have created a 22 500 mega-watt pipeline of projects. More than 10 000 mega-watts are formally registered with the NERSA, which is one of the last steps in the regulatory process. These projects will contribute to reducing power cuts.
The Freight Logistics Roadmap has been approved. The roadmap allows private sector participation and gives third-party access to any operator without discrimination in accordance with the network statement.
The Department of Transport and Transnet will engage the market on private sector participation projects in the following areas:
Read the full Budget Speech made by Finance Minister Enoch Godongwana on 12 March 2025.

This report highlights artificial intelligence (AI) and big data innovations and their applications for Africa’s mining sector.

The project, to be developed in Morocco's Rabat-Salé-Kénitra Free Trade Zone, will produce battery cathodes, cells and battery packs within a single integrated manufacturing facility.

In this third edition of our study, we explore how mining companies and their CEOs are embracing AI not just to improve productivity, but to reimagine what mining can be.